CRESCENT POINT ENERGY CORP.
2020
Work Completed/Ongoing:
-
08-25 Truck Risers
-
05-31 Compressor Install
-
15-31 Compressor Maintenance
-
04-26 Water Disposal
-
09-14 Drain Line/ESD Bypass
-
14-27 Meter Addition
-
04-26 Water Disposal Bypass
-
01-21 Spool Replacement
-
01-31 Oil Battery
2019
Work Completed:
-
Torquay Battery Mechanical Upgrade
-
Hoffer Battery Mechanical/Structural Construction
-
Flat Lake Transloader Install
-
Nomad Compressor
-
Various Tank and Piping Installations
2018
Work Completed:
-
Flare Knockout Installation
-
Amine Plant Piling
-
Amine Unit Addition
-
Flat Lake Earthwork
-
Stoughton Oil Battery Upgrades
-
Flat Lake Water Injection
-
Torquay Oil Battery Upgrades
-
Water Tank Replacements
-
Various Maintenance
2017
-
Various Maintenance work throughout Southeast Saskatchewan
-
Multiple Battery and Compressor installations which included:
-
Civil grading lease, building tank containment areas, and spreading gravel
-
Cutting and capping of piles
-
Structural fabrication and installation
-
Equipment installation
-
Piping fabrication and installation
-
Start up assistance
-
Plant turnarounds
-
2016
-
Various Maintenance work throughout Southeast Saskatchewan
-
Multiple Battery, Compressor, FWKO & Treater installations which included:
-
Civil grading lease, building tank containment areas, and spreading gravel
-
Cutting and capping of piles
-
Structural fabrication and installation
-
Equipment installation
-
Piping fabrication and installation
-
Start up assistance
-
Plant turnarounds
-
2015
-
Various Maintenance work throughout Southeast Saskatchewan
-
Multiple Battery installations which included:
-
Civil grading lease, building tank containment areas, and spreading gravel
-
Cutting and capping of piles
-
Structural fabrication and installation
-
Equipment installation
-
Start up assistance
-
Plant turnarounds
-
2014
-
Various Maintenance work throughout Southeast Saskatchewan
-
New Battery installation which included:
-
Civil grading lease, building tank containment areas, and spreading gravel
-
Cutting and capping of piles
-
Structural fabrication and installation
-
Equipment installation
-
Piping fabrication and installation
-
Start up assistance
-
REFERENCE:
Crescent Point Energy Corp.
Kevin Muchowski
kmuchowski@crescentpointenergy.com
Office (403) 767-6467