GIBSON ENERGY
Moose Jaw Refinery
Major Projects:
-
Tank 43 & 60 Mechanical
-
Reduced Crude Pump Upgrades
-
Tank Farm Upgrades
-
Maintenance Support during Annual Shutdown
-
API Separator Replacement
-
Cold Crude Upgrade
-
Maintenance Support during Annual Shutdown
-
VGO Separator – Fabrication and Installation
-
Vac Bottoms Discharge Spool
-
Debottleneck Deadlegs
-
Reduced Crude Suction Piping
-
2” Desalter Wash Line
-
12” ESD Valve Relocation
-
Pumproom Cooling Water Line
-
COVID-19 Support Requirements
-
Debottlenecking Project – Mechanical/Structural/Civil
-
400 Tank Farm Truck Offload Line
-
Inline Pigging
-
Crude Unit Trenches (Concrete)
-
Steam Shedding Valve Upgrades
-
400 Tank Farm Meter Upgrade
-
Asphalt Rundown Line Upgrade
-
Crude Overhead Vapour Line
-
AGO Control Valve Piping
-
Tank 42 Piping/Pipe Supports
-
Platform Upgrade
-
Various Maintenance