Moose Jaw Refinery

2020

Work Completed/Ongoing:

  • API Separator Replacement (completed in 2020)

  • Cold Crude Upgrade (completed in 2020)

  • Maintenance Support during Annual Shutdown

  • VGO Separator – Fabrication and Installation

  • Vac Bottoms Discharge Spool

  • Debottleneck Deadlegs

  • Reduced Crude Suction Piping

  • 2” Desalter Wash Line

  • 12” ESD Valve Relocation

  • Pumproom Cooling Water Line

  • COVID-19 Support Requirements

2019

Work Completed:

  • Debottlenecking Project – Mechanical/Structural/Civil

  • 400 Tank Farm Truck Offload Line

  • Inline Pigging

  • Crude Unit Trenches (Concrete)

  • Steam Shedding Valve Upgrades

  • 400 Tank Farm Meter Upgrade

  • API Separator Replacement (completed in 2020)

  • Cold Crude Upgrade (completed in 2020)

  • Maintenance Support during Annual Shutdown

2018
Work Completed:

  • Asphalt Rundown Line Upgrade

  • Crude Overhead Vapour Line

  • AGO Control Valve Piping

  • Tank 42 Piping/Pipe Supports

  • Platform Upgrade

  • 2018 Maintenance Shutdown Support

2017

Work Completed: 

  • Plant turnarounds and maintenance

  • Structural fabrication and installation

  • Piping fabrication and installation

  • Start up assistance