top of page

GIBSON ENERGY

Moose Jaw Refinery

​

Major Projects:

  • Tank 43 & 60 Mechanical

  • Reduced Crude Pump Upgrades

  • Tank Farm Upgrades

  • Maintenance Support during Annual Shutdown

  • API Separator Replacement

  • Cold Crude Upgrade

  • Maintenance Support during Annual Shutdown

  • VGO Separator – Fabrication and Installation

  • Vac Bottoms Discharge Spool

  • Debottleneck Deadlegs

  • Reduced Crude Suction Piping

  • 2” Desalter Wash Line

  • 12” ESD Valve Relocation

  • Pumproom Cooling Water Line

  • COVID-19 Support Requirements

  • Debottlenecking Project – Mechanical/Structural/Civil

  • 400 Tank Farm Truck Offload Line

  • Inline Pigging

  • Crude Unit Trenches (Concrete)

  • Steam Shedding Valve Upgrades

  • 400 Tank Farm Meter Upgrade

  • Asphalt Rundown Line Upgrade

  • Crude Overhead Vapour Line

  • AGO Control Valve Piping

  • Tank 42 Piping/Pipe Supports

  • Platform Upgrade

  • Various Maintenance

​

​

MAKE THE RIGHT CHOICE- CALL US TODAY.

-© 2025 RIGHT CHOICE ENERGY SERVICES INC.

MOOSE JAW, SASK - 306-693-3030 / WEYBURN, SASK- 306-693-3030

bottom of page