top of page
WHITECAP RESOURCES INC.
Major Projects:
-
16-11 Rebuild and Install PSV Discharge Spool
-
2023 Turnaround
-
Firetube Repairs
-
SW SK Spring Cleanup
-
Tank 10 Source Water Line
-
14-31 Spool Replacement
-
Cooler Platform and Ladder – Fabrication and Installation
-
Gas Meter Upgrades
-
Assist with 2020 Shutdown as Required
-
12” CO2 Line Replacement
-
EOR Test Separator
-
Skim Line Replacement
-
Treater Flush Valves
-
Maintenance Shutdown 2019
-
WEYU PH2 Debottleneck Project
-
Gas Meter Replacements
-
F-602C Coalescer
-
Gas Meter Replacement
-
Dehy Pressure Control Installation
-
NGL Shutdown and Maintenance
-
Various Maintenance
​
​
​
bottom of page