WHITECAP ENERGY INC.
2020
Work Completed/Ongoing:
-
14-31 Spool Replacement
-
Cooler Platform and Ladder – Fabrication and Installation
-
Gas Meter Upgrades
-
Assist with 2020 Shutdown as Required
-
Various Maintenance
2019
Work Completed:
-
12” CO2 Line Replacement
-
EOR Test Separator
-
Skim Line Replacement
-
Treater Flush Valves
-
Maintenance Shutdown 2019
-
WEYU PH2 Debottleneck Project
-
Gas Meter Replacements
-
Various Maintenance
2018
Work Completed:
-
F-602C Coalescer
-
Gas Meter Replacement
-
Dehy Pressure Control Installation
-
NGL Shutdown and Maintenance
-
Various Maintenance
2017
Work Completed:
-
Heavy Oil upgrades which included:
-
Civil work grading lease, building concrete tank bases, and spreading gravel
-
Cutting and capping of piles
-
Structural fabrication and installationg
-
Equipment installation
-
Piping fabrication and installation
-
Start up assistance
-
REFERENCE:
WhiteCap Resources Inc
Duane Walkeden
Duane.Walkeden@wcap.ca
Office (306) 848-6162